[openssl-project] 1.1.1 Release timetable
Salz, Rich
rsalz at akamai.com
Fri Dec 22 18:16:14 UTC 2017
Dropping the second alpha as a way to bring in the release date is okay, but I don’t have anything that would have to be in the end-of-January freeze. Given how little feedback we got during our extended pre-release periods for 1.1.0 I don’t think we need a lot of time.
According to email I had with one of the Security AD’s, she wants the TLS WG to be done in January, and then a month for IESG review. Allowing for slippage that means March. But nobody knows for sure.
More information about the openssl-project
mailing list